Power Situation Update 3 May 2019 (as of 12NN)

GRID STATUS:           RED from 1100H and 1300-1600H (10:01-11:00AM, 12:01-4:00PM)

                                    YELLOW from 1000, 1200H, 1700H and 1900-2100H (9:01-10:00AM, 11:01AM-                                     12:00NN, 4:01-5:00PM, 6:01-9:00PM)

LUZON POWER PLANT OUTAGES/DERATED

As of 12:00 NN, 3 May 2019, Friday

Forced Outage (due to Earthquake)

Power Plant

Installed Capacity (MW)

Dependable Capacity (MW)

Cause

Date Out

Estimated Date In

GNPower Mariveles Power  Ltd. (GMPC) U2

345

316

Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake; ongoing troubleshooting after failed synchronization on 2 May 2019 evening

22-Apr-2019

TBD

Total

345

316

 

 

 

 

 

Unplanned/Forced Outage

Power Plant

Installed Capacity (MW)

Dependable Capacity (MW)

Cause

Date Out

Estimated Date In

SEM-Calaca Power Corporation (SCPC)

Calaca U2

300

200

Boiler Tube Leak

28-Apr-2019

4-May-2019

Team Energy Corporation (TEC) Pagbilao U1

382

382

Tripped due to excessive water leak at feed water flow sensing line

2-May-2019

6-May-2019

Total

682

582

 

 

 

 

 

De-rated/Reduced Capacity

Power Plant

Dependable Capacity (MW)

Declared Capacity (MW)

Derating/ Reduced Capacity (MW)

Cause

Pagbilao Energy Corporation (PEC) Pagbilao U3

420

300

120

Boiler condition under assessment

Angat Hydroelectric Power Plant Main Units

200

84

116

Limited output due to low water level

Pantabangan Hydroelectric Power Plant

120

48

72

Limited output due to low water level

Binga Hydroelectric Power Plant

138

70

68

Limited output due to low water level

Kalayaan Pumped Storage Hydro Power Plant

720

360

360

Limited output due to low water level

Total

 

 

736

 

 

Source: NGCP, concerned power plants

TBD – To be determined