December 19, 2017
(Taguig City). Installation of electric posts has already commenced at the newly built Transitional Shelter areas for displaced families in Marawi City after the 5-month long siege by terrorist groups.
In photo fixing the distribution lines are the line men of Lanao del Norte Electric Cooperative, Inc. (LANECO) who are helping rebuild Marawi through Task Force Bangon Marawi.
The installation of the distribution lines is supervised by Lanao del Sur Electric Cooperative which holds the franchise to Marawi City.
FULL STORY: http://bit.ly/EPoweringMarawi