I. Normal Condition Issuance
The NGCP issued a Normal Condition advisory for the Luzon Grid today.
II. Entry of Power Plants
South Luzon Thermal Energy Corp. (SLTEC) Unit 1 of Ayala is now running on full load. It was synchronized to the grid at 2:03 AM yesterday and achieved full load at 8:50 AM.
III. Forced Outages
Please refer to the table for the updated list of power plants that are derated and on forced outage.
Power Plant | Installed Capacity (MW) | Cause | Date Out | Estimated Date In |
Panasia Energy Inc. (PEI) Limay A1 |
70 | Tripped due to actuation of turbine overspeed relay | 13-Apr-2019 | TBD |
SMC Consolidated Power Corporation (SMCCPC) Limay U2 |
150 | Boiler tube leak | 11-Apr-2019 | 16-Apr-2019* |
TeaM Energy Corporation Sual U1 |
647 | Boiler Circulating Pump piping leak | 09-Apr-2019 | 18-Apr-2019* |
Southwest Luzon Power Generation Corporation (SLPGC) U2 |
150 | Vibration in Primary Air Fan | 07-Apr-2019 | 21-Apr-2019 |
Pagbilao Energy Corporation (PEC) Pagbilao U3 |
420 | Boiler slagging | 02-Apr-2019 | 16-Apr-2019 |
Total | 1,437 |
Source: NGCP, concerned power plants
*preliminary information
TBD- to be determined
Power Plant | Installed Capacity (MW) | Declared Capacity (MW) | Derating/Reduced Capacity (MW) | Cause |
SEM-Calaca Power Corporation (SCPC) Calaca U2 |
300 | 200 | 100 | Half condenser operation |
Total | 100 |
Source: NGCP, concerned power plants
The DOE will continue to update the public on further developments.
###