Power Situation Update 14 April 2019 (as of 4:30pm)

 

I. Normal Condition Issuance 

The NGCP issued a Normal Condition advisory for the Luzon Grid today.

II. Entry of Power Plants

South Luzon Thermal Energy Corp. (SLTEC) Unit 1 of Ayala is now running on full load. It was synchronized to the grid at 2:03 AM yesterday and achieved full load at 8:50 AM.

III. Forced Outages and Derated Plants

Masinloc Unit 1 of San Miguel is running on a derated capacity of 304 MW. 

Please refer to the table for the updated list of power plants that are derated and on forced outage. 

Unplanned/Forced Outage

Power Plant Installed Capacity (MW) Cause Date Out Estimated Date In

SMC Consolidated Power Corporation (SMCCPC)

Limay U2

150 Boiler tube leak 11-Apr-2019 16-Apr-2019*

TeaM Energy Corporation

Sual U1

647 Boiler Circulating Pump piping leak 09-Apr-2019 18-Apr-2019*

Southwest Luzon Power Generation Corporation

(SLPGC) U2

150 Vibration in Primary Air Fan 07-Apr-2019 21-Apr-2019

Pagbilao Energy Corporation (PEC)

Pagbilao U3

420 Boiler slagging 02-Apr-2019 16-Apr-2019
Total 1,367      

 

De-rated/Reduced Capacity

Power Plant Installed Capacity (MW) Declared Capacity (MW) Derating/Reduced Capacity (MW) Cause

Masinloc Power Partners Co. Ltd. (MPPCL)

Masinloc U1

315 304 11 TBD

SEM-Calaca Power Corporation (SCPC)

Calaca U2

300 200 100 Hald condenser operation
Total     111  

Source: NGCP, concerned power plants

*preliminary information

TBD-to be determined

 

The DOE will continue to update the public on further developments. 

###