GRID STATUS: RED from 1100H and 1300-1600H (10:01-11:00AM, 12:01-4:00PM)
YELLOW from 1000, 1200H, 1700H and 1900-2100H (9:01-10:00AM, 11:01AM- 12:00NN, 4:01-5:00PM, 6:01-9:00PM)
LUZON POWER PLANT OUTAGES/DERATED
As of 12:00 NN, 3 May 2019, Friday
Forced Outage (due to Earthquake) |
|||||
Power Plant |
Installed Capacity (MW) |
Dependable Capacity (MW) |
Cause |
Date Out |
Estimated Date In |
GNPower Mariveles Power Ltd. (GMPC) U2 |
345 |
316 |
Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake; ongoing troubleshooting after failed synchronization on 2 May 2019 evening |
22-Apr-2019 |
TBD |
Total |
345 |
316 |
|
|
|
Unplanned/Forced Outage |
|||||
Power Plant |
Installed Capacity (MW) |
Dependable Capacity (MW) |
Cause |
Date Out |
Estimated Date In |
SEM-Calaca Power Corporation (SCPC) Calaca U2 |
300 |
200 |
Boiler Tube Leak |
28-Apr-2019 |
4-May-2019 |
Team Energy Corporation (TEC) Pagbilao U1 |
382 |
382 |
Tripped due to excessive water leak at feed water flow sensing line |
2-May-2019 |
6-May-2019 |
Total |
682 |
582 |
|
|
|
De-rated/Reduced Capacity |
||||
---|---|---|---|---|
Power Plant |
Dependable Capacity (MW) |
Declared Capacity (MW) |
Derating/ Reduced Capacity (MW) |
Cause |
Pagbilao Energy Corporation (PEC) Pagbilao U3 |
420 |
300 |
120 |
Boiler condition under assessment |
Angat Hydroelectric Power Plant Main Units |
200 |
84 |
116 |
Limited output due to low water level |
Pantabangan Hydroelectric Power Plant |
120 |
48 |
72 |
Limited output due to low water level |
Binga Hydroelectric Power Plant |
138 |
70 |
68 |
Limited output due to low water level |
Kalayaan Pumped Storage Hydro Power Plant |
720 |
360 |
360 |
Limited output due to low water level |
Total |
|
|
736 |
|
Source: NGCP, concerned power plants
TBD – To be determined