The Department of Energy (DOE) is issuing this update after receiving the latest reports from the concerned members of the Energy family.
I. National Electrification Administration
• Based on the Power Monitoring Report of the National Electrification Administration (3PM of 3PM of 9 September 2021), initial estimates are currently at PhP 6.3 Million.
MARELCO: PhP 0.3 Million
ROMELCO: PhP 6 Million
Remaining 13 Electric Cooperatives: on-going cost estimation.
II. National Grid Corporation of the Philippines
Cost estimation on-going.
III. MERALCO
Cost estimation on-going.
Subsequent updates will be released as soon as the pertinent information becomes available.
###